Which metrological relevant components are relevant?
Graphic: Basics measuring system
- Flowmeters
- Flow computer
- Gas separator
- Pressure and temperature measurement sensors
- Printer
- Data recording and storage
Full hose system:
In full hose loading systems, the measurement point is as close as possible to the end of the delivery hose. For unloading full hose systems, it is at the beginning of the receiving hose. In both cases, the hose remains filled before, during and after loading.
Dry hose system:
In loading empty hose systems, the transfer point is as close as possible to the beginning of the delivery loop (inlet side). For unloading empty hose systems, it is at the end of the receiving hose (outlet side).
In both cases, the hose is filled only during loading.